|
blurb :
designed for a national stadium tour this set was used for a meet and greet warm up on the stadium forecourt. i designed a shipping container into the set as a means of; defeating wind loadings, providing a raised dj stage and safely moving around the required merchandise/themeing. it takes two skilled people 20 minutes to install.
|
venue :
national stadium tour
|
date :
october 2006
|
role / responsibility :
design, project management, construction
|